Electrical Work (almost done)

...(By this Saturday, I hope) The clock is ticking, and I'm hearing Pink Floyd's cash registers as I watch the clock. But, Andy is doing a good job, so I'm being patient.
I also scheduled the electrical inspection for next Tuesday.


What's going on:



These are the recessed lights in front of the new wall. Like all of the recessed lights they are Halo 3" low voltage.





This is the junction box where the remote transformer will be located for the track in front of the brick wall.




Here is the new j-box for the track which will be low voltage ready.



Here are the four recessed cans in the kitchen




Here is what's going on in the new wall, fluorescent light on top, two countertop receptacles, receptacles for a microwave and the refrigerator, and a line for the under shelf light.




Close up of the lines coming through the sofit, which has a 2 or 3" water line running through it.





New switches by the front door.





New switches just outside the kitchen.